in the same location.
Wayne
----- Original Message -----
From: "Jesse Jenks" <jessejenks@hotmail.com>
To: <rebel-builders@dcsol.com>
Sent: Thursday, November 30, 2006 9:04 PM
Subject: [rebel-builders] Fuel line
I am planning to run the fuel lines in a similar location to what is shown
in the archive picture, but under the floor. For the section that runs
under
the horizontal part of the door sill I think it will have about a 5 degree
down slope. I am wondering if this will produce a net down slope in the 3
point attitude?
Also, I will obviously have to go through the cage uprights. I plan to
drill
a 1/2" hole about 3 inches down from the top of the strut/gear brackets
centered between 4 rivets. The edge distance looks OK for the rivets. Has
anyone done this?
I think I can use continuous lines for the buried part by installing them
as
I rivet the forward fuselage structure together, so I shouldn't need any
extra inspection holes. We'll see.
Thanks
Jesse
_________________________________________________________________
Get the latest Windows Live Messenger 8.1 Beta version. Join now.
http://ideas.live.com
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------