Do you want this big green box to go away? Well here's how...

Click here for full update

Wildcat! photo archives restored.

Click here for full update

Donors can now disable ads.

Click here for instructions

Add yourself to the user map.

Click here for instructions

question...

Converted from Wildcat! database. (read only)
Locked
Jean Poirier

question...

Post by Jean Poirier » Sat Feb 18, 2012 10:10 am

I am now at the step of last cleaning before rivet/proseal the gas tank.... On the solid main rib, for the 3 flanges that we rivet/proseal (for gas level sight and gas output) the manual don't show nothing about the hole we should do at the bottom of those flange. Should I make them now or if I let it like that (to bo done later at a another step)? Manual is so clear......

Jean
Rebel 747R




-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------

Drew Dalgleish

question...

Post by Drew Dalgleish » Sat Feb 18, 2012 10:10 am

At 03:32 PM 2/12/2005 -0500, you wrote:
I am now at the step of last cleaning before rivet/proseal the gas
tank.... On the solid main rib, for the 3 flanges that we rivet/proseal
(for gas level sight and gas output) the manual don't show nothing about
the hole we should do at the bottom of those flange. Should I make them
now or if I let it like that (to bo done later at a another step)? Manual
is so clear......
Jean
Rebel 747R
I drilled the holes before pro-sealing and rivetting the flanges on.
Probably doesn't matter if you wait but it could be tough to drill without
damaging the threads on the flange.
Drew





-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------

jean.poirier

question...

Post by jean.poirier » Sun Feb 19, 2012 10:31 am

Hello,

I am working on the tail section of the fuselage (Rebel).

Before making the floor, the manual send me to the float attache point
#12.27. At 12.27.22, the manual ask to rivet the bulkhead "doubler"
to the outer corner wrap... but that corner wrap is still drill to #40 and is not
riveted in the others location.... Look "bizarre" and I would like to double
check...

Please let me know....
Jean
Rebel 747R







-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------


Locked