Amphib float building tip - main gear mechanism
Posted: Sat Feb 18, 2012 2:53 pm
Thought I'd throw this up while I'm building this set. MAM's "hold to the
line/drill and cleco" on the FL-201/202's (that hold all the main gear
components that swing) just doesn't cut it if you expect the mechanism to
swing right and not bind. Also why guess at the positioning width...use the
mating components to be sure it's right!
When you get to the stage of building bulkhead "G" take all 4 of the gear
attach brackets and place them on G. Then mount BOTH of the main gear
retract toggle plates..with one attached to each end of the FL201/202's and
include the proper spacers. Then clamp the open ends of both toggle plates
together with spring clamps and this holds all four of the attach plates
perfectly square... so everything will pivot properly.....hinge bolts will
install cleanly etc.
Doing each FL-201/202 by sight per the manual will have the pivot holes
offset with each other no matter how hard you try to be accurate and it
takes very little vertical misalignment to cause binding.
The way I do it makes it easy as pie. Put the assembly together as pictured.
Line the inner attach brackets up with the lines marked in the manual and
drill and cleco the bottom of each inner bracket. Then drill the top holes
on the two inners. Then you can do the outer two brackets the same way while
holding them light pressure to allow a slight clearance in the pivot area.
http://www.irishfield.on.ca/gallery/amp ... 1-202s.jpg
Cheers,
Wayne
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------
line/drill and cleco" on the FL-201/202's (that hold all the main gear
components that swing) just doesn't cut it if you expect the mechanism to
swing right and not bind. Also why guess at the positioning width...use the
mating components to be sure it's right!
When you get to the stage of building bulkhead "G" take all 4 of the gear
attach brackets and place them on G. Then mount BOTH of the main gear
retract toggle plates..with one attached to each end of the FL201/202's and
include the proper spacers. Then clamp the open ends of both toggle plates
together with spring clamps and this holds all four of the attach plates
perfectly square... so everything will pivot properly.....hinge bolts will
install cleanly etc.
Doing each FL-201/202 by sight per the manual will have the pivot holes
offset with each other no matter how hard you try to be accurate and it
takes very little vertical misalignment to cause binding.
The way I do it makes it easy as pie. Put the assembly together as pictured.
Line the inner attach brackets up with the lines marked in the manual and
drill and cleco the bottom of each inner bracket. Then drill the top holes
on the two inners. Then you can do the outer two brackets the same way while
holding them light pressure to allow a slight clearance in the pivot area.
http://www.irishfield.on.ca/gallery/amp ... 1-202s.jpg
Cheers,
Wayne
-----------------------------------------------------------------