tank skin rivet spacing
Posted: Sat Feb 18, 2012 2:07 pm
I'm working on the tank skins on my second (left) wing and am embarrassed to
find that I missed something fairly important on the first wing and tank
skin. MAM (1994) says to put an extra hole between the prepunched holes on
Ribs 1 & 4 and the Main Spar. I got this on the ribs fine but missed it on
the main spar. Still can't believe I missed this, but glad I caught it now.
After careful double checking I see that the in-between holes to the Main
spar are called for on the bottom skin, but not on the top. (in-between
holes to ribs 1&4 on bottom and top, but to main skin on bottom only). Just
to help me believe all this, can someone confirm for me that rivet spacing
for the tank to main spar is about 5/8 inch on the bottom (1.25" before
drilling the in-between holes), and is about 1 inch spacing on the top tank
to main spar?
Also, I need to go back to the first wing, mark out and drill the in-between
holes I missed on the bottom, and proseal rivet these. This after that wing
is otherwise "done". I feel pretty sure that this is unlikely to introduce
any tank leaks, and the worst of it will be that I'll have to figure out how
to get drill chips out of the tank. Any thoughts on how to minimize chances
of making leaks in this process? I figure I may be able to vacuum and or
slosh the chips out instead of having to make a tank inspection port already.
Thanks all,
-Ben / 496R
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------
find that I missed something fairly important on the first wing and tank
skin. MAM (1994) says to put an extra hole between the prepunched holes on
Ribs 1 & 4 and the Main Spar. I got this on the ribs fine but missed it on
the main spar. Still can't believe I missed this, but glad I caught it now.
After careful double checking I see that the in-between holes to the Main
spar are called for on the bottom skin, but not on the top. (in-between
holes to ribs 1&4 on bottom and top, but to main skin on bottom only). Just
to help me believe all this, can someone confirm for me that rivet spacing
for the tank to main spar is about 5/8 inch on the bottom (1.25" before
drilling the in-between holes), and is about 1 inch spacing on the top tank
to main spar?
Also, I need to go back to the first wing, mark out and drill the in-between
holes I missed on the bottom, and proseal rivet these. This after that wing
is otherwise "done". I feel pretty sure that this is unlikely to introduce
any tank leaks, and the worst of it will be that I'll have to figure out how
to get drill chips out of the tank. Any thoughts on how to minimize chances
of making leaks in this process? I figure I may be able to vacuum and or
slosh the chips out instead of having to make a tank inspection port already.
Thanks all,
-Ben / 496R
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------