Page 1 of 1

612e status ...

Posted: Sat Feb 18, 2012 1:38 pm
by Bob Andrews
Greetings,

and ... thanks for all your inputs thus far ... most helpful.

Work on repairing 612e has stepped up a notch over the past two month summer
slow down ... the finish line is slowly coming into sight. The 0.025 front
side skins and the 0.032 bottom front wraps are on ... sure stiffened up the
front end ...

http://www.aacnet.com/elite/Latest/index.htm

The gear is finally back on, and soon will be rolling around free of the
table. The left wing repair (new rear spar, three new ribs, and some new
skin) is done (less tip installations), the new left aileron is almost done,
the stab repair is still waiting for me ... and of course the fuselage is
still in work ... only one thing left to do ... finish up ... :)

Cheers,

Bob 612e






-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------