Do you want this big green box to go away? Well here's how...

Click here for full update

Wildcat! photo archives restored.

Click here for full update

Donors can now disable ads.

Click here for instructions

Add yourself to the user map.

Click here for instructions

Headsup

Converted from Wildcat! database. (read only)
Locked
Jim Cole

Headsup

Post by Jim Cole » Sat Feb 18, 2012 10:31 am


I know I'm probably a little slower than all you other Moose builders but I almost forgot to put the large doubler on the leading edge skin before I riveted all the stringers. Fortunetly I've only drilled to #30 and duburred and was getting ready to rivet. Now I need to catch up with the doubler part #711.

Just a reminder to those who have upgrade kits from the 2500 to the 3500.

Cheers
Jim
-----------------------------------------------------------------
List archives located at: https://www.dcsol.com/login
username "rebel" password "builder"
Subscription services located at:
https://www.dcsol.com/public/code/html-subscribe.htm
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------








-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------

Wayne G. O'Shea

Headsup

Post by Wayne G. O'Shea » Sat Feb 18, 2012 10:32 am

Could be worse Jim! You could have to drill all those rivets out,
compromise a couple nicely pressure tested fuel tanks etc and re rivet thing
down with the doubler sheet in place. I haven't been blessed with this "fun"
yet....but Peter and Monica have been there...done that!

Wayne


----- Original Message -----
From: "Jim Cole" <jcole@rangroup.com>
To: <rebel-builders@dcsol.com>
Sent: Saturday, May 21, 2005 10:29 AM
Subject: Re: Headsup


I know I'm probably a little slower than all you other Moose builders but
I almost forgot to put the large doubler on the leading edge skin before I
riveted all the stringers. Fortunetly I've only drilled to #30 and duburred
and was getting ready to rivet. Now I need to catch up with the doubler part
#711.
Just a reminder to those who have upgrade kits from the 2500 to the 3500.

Cheers
Jim
-----------------------------------------------------------------
List archives located at: https://www.dcsol.com/login
username "rebel" password "builder"
Subscription services located at:
https://www.dcsol.com/public/code/html-subscribe.htm
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------








-----------------------------------------------------------------
List archives located at: https://www.dcsol.com/login
username "rebel" password "builder"
Subscription services located at:
https://www.dcsol.com/public/code/html-subscribe.htm
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------





-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------

Locked