Do you want this big green box to go away? Well here's how...

Click here for full update

Wildcat! photo archives restored.

Click here for full update

Donors can now disable ads.

Click here for instructions

Add yourself to the user map.

Click here for instructions

Bottom carrythrough rivets

Converted from Wildcat! database. (read only)
Locked
Joel Jacobs

Bottom carrythrough rivets

Post by Joel Jacobs » Sat Feb 18, 2012 9:31 am

Hi folks,

My manual - fuselage step 391 told me to drill one row of 3/16 rivets
down the center of each carrythrough tube at 1" spacing.

My newer manual on the CD also says this same thing at 12.21.1.

I drilled these two single rows of rivets so far only to #40 through
SG-13, FUS-40, the packer SG-18 and the carrythroughs.

Ok, now I go to do the 'sculpting' of SG-13 and the drawing in the
spring gear instructions clearly show TWO rows of rivets down each
carrythrough tube. Hmmm, I count the rivets sent with the spring gear
kit and there are enough for TWO rows in each tube.

I can't find anywhere in the manual or the spring gear instructions
where it said to drill two rows down each tube, I only have the drawing
and the bag of rivets to lead me that way.

Man I hate when this happens, now what? Here's the options I've thought
of so far..

1) Just go with one row down each tube - seems plenty strong to me but
I'm not a structual engineer. It evedently was strong enough for the
bungee gear though.

2) Drill the second row on each tube near the edge - in line with the
saddle bolts maybe. The rows will be close together - about 1/2-5/8
apart. Enough for edge distance but will look a bit crowded.

3) Drill two more rows near the edges of the tubes. The old #40 holes
will be between the new rows. The SG-7 plate - the last piece to go on
has not been drilled yet so It would hide the #40 holes when assembled.

Suggestions?
Thanks much!
Joel



-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------

Wayne G. O'Shea

Bottom carrythrough rivets

Post by Wayne G. O'Shea » Sat Feb 18, 2012 9:31 am

Ya sure the rivet count doesn't cover the amount you need for the inside
plates as well ??? Sent you a couple pics direct. Wayne

----- Original Message -----
From: "Joel Jacobs" <jj@sdf.lonestar.org>
To: <rebel-builders@dcsol.com>
Sent: Saturday, September 18, 2004 1:24 PM
Subject: Bottom carrythrough rivets

Hi folks,

My manual - fuselage step 391 told me to drill one row of 3/16 rivets
down the center of each carrythrough tube at 1" spacing.

My newer manual on the CD also says this same thing at 12.21.1.

I drilled these two single rows of rivets so far only to #40 through
SG-13, FUS-40, the packer SG-18 and the carrythroughs.

Ok, now I go to do the 'sculpting' of SG-13 and the drawing in the
spring gear instructions clearly show TWO rows of rivets down each
carrythrough tube. Hmmm, I count the rivets sent with the spring gear
kit and there are enough for TWO rows in each tube.

I can't find anywhere in the manual or the spring gear instructions
where it said to drill two rows down each tube, I only have the drawing
and the bag of rivets to lead me that way.

Man I hate when this happens, now what? Here's the options I've thought
of so far..

1) Just go with one row down each tube - seems plenty strong to me but
I'm not a structual engineer. It evedently was strong enough for the
bungee gear though.

2) Drill the second row on each tube near the edge - in line with the
saddle bolts maybe. The rows will be close together - about 1/2-5/8
apart. Enough for edge distance but will look a bit crowded.

3) Drill two more rows near the edges of the tubes. The old #40 holes
will be between the new rows. The SG-7 plate - the last piece to go on
has not been drilled yet so It would hide the #40 holes when assembled.

Suggestions?
Thanks much!
Joel



-----------------------------------------------------
List archives located at:
https://www.dcsol.com/default.htm
username "rebel" password "builder"
Subscription services located at:
https://www.dcsol.com/public/code/html-subscribe.htm
List administrator: mike.davis@dcsol.com
-----------------------------------------------------





-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------

Joel Jacobs

Bottom carrythrough rivets

Post by Joel Jacobs » Sat Feb 18, 2012 9:31 am

Hi Wayne, Thanks a million! Your pictures show exactly as I have done and
yes I forgot about the top plates when counting the rivets. Also, I looked
up the newer spring gear instructions on the MAM CD and the figure has been
changed to only show one row on each tube. Yeah! Back to work!
Joel


----- Original Message -----
From: "Wayne G. O'Shea" <oifa@irishfield.on.ca>
To: <rebel-builders@dcsol.com>
Sent: Saturday, September 18, 2004 2:01 PM
Subject: Re: Bottom carrythrough rivets

Ya sure the rivet count doesn't cover the amount you need for the inside
plates as well ??? Sent you a couple pics direct. Wayne

----- Original Message -----
From: "Joel Jacobs" <jj@sdf.lonestar.org>
To: <rebel-builders@dcsol.com>
Sent: Saturday, September 18, 2004 1:24 PM
Subject: Bottom carrythrough rivets

Hi folks,

My manual - fuselage step 391 told me to drill one row of 3/16 rivets
down the center of each carrythrough tube at 1" spacing.

My newer manual on the CD also says this same thing at 12.21.1.

I drilled these two single rows of rivets so far only to #40 through
SG-13, FUS-40, the packer SG-18 and the carrythroughs.

Ok, now I go to do the 'sculpting' of SG-13 and the drawing in the
spring gear instructions clearly show TWO rows of rivets down each
carrythrough tube. Hmmm, I count the rivets sent with the spring gear
kit and there are enough for TWO rows in each tube.

I can't find anywhere in the manual or the spring gear instructions
where it said to drill two rows down each tube, I only have the drawing
and the bag of rivets to lead me that way.

Man I hate when this happens, now what? Here's the options I've thought
of so far..

1) Just go with one row down each tube - seems plenty strong to me but
I'm not a structual engineer. It evedently was strong enough for the
bungee gear though.

2) Drill the second row on each tube near the edge - in line with the
saddle bolts maybe. The rows will be close together - about 1/2-5/8
apart. Enough for edge distance but will look a bit crowded.

3) Drill two more rows near the edges of the tubes. The old #40 holes
will be between the new rows. The SG-7 plate - the last piece to go on
has not been drilled yet so It would hide the #40 holes when assembled.

Suggestions?
Thanks much!
Joel


-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------


Locked