SR3500 SB0002270602 Fuselage
Posted: Fri Feb 17, 2012 10:18 pm
Have attached below a copy of a SB that is coming out from MAM, but not
posted on their site yet. Pretty self explainatory with the picture, but
it's not here so I will explain. The Drag Link is the SB090520SR that was
asked for some time ago to strenghten the gear on the 2500. When I did the
3500 upgrades I milled the face of this part by the thickness of the FUS-703
steel plate and put it back into the same door sill "wrap" rivet holes, so
not hard to do guys and gals. The "inter-pitching" is simply adding another
rivet between each existing rivet in the forward door post closest to the
door (as I have done on Rebel's for 7 years) for LARGE tire operations and
also on both of the door post bulkheads immediately behind the door for
float operations. I would do them both no matter what configuration you plan
to fly! Without the extra rivets the skin apparently tries to buckle in the
inch or so gap between rivets.
Cheers,
Wayne G. O'Shea
www.irishfield.on.ca
***SAFETY BULLETIN***
MURPHY AIRCRAFT MFG. Ltd., DATE: 27 June 2002
8155 AITKEN ROAD,
CHILLIWACK,
B.C.
CANADA V2R 4H5
Tel: (604) 792-5855
Fax: (604) 792-7006
Murtech@murphyair.com
AIRCRAFT AFFECTED: SUPER REBEL 3500
Owners of SR3500's who are intending to fit the large "Alaska" wheels and
tires to their aircraft, should complete the following modifications.
Due to the greatly increased initial drag of the tires on touch down and the
extra weight of the rims, our demonstrator aircraft has shown slight
movement of the gear legs, and some inter-rivet buckling in the vertical
rivet line on the aft channel of the lift cage.
1/ The 2500 drag link should be installed as per bulletin 090520SR. This
will prevent any flexing of the steel plates FUS-703.
2/ Inter-pitching (installing an additional rivet between the existing
rivets) of the existing rivets with RV-1410's in the rivet lines indicated
in Fig. 1.
These modifications can be completed by all owners if desired.
Owners who intend going on floats should also complete inter-pitching of the
rivets in the two bulkheads indicated in Fig. 1.
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------
posted on their site yet. Pretty self explainatory with the picture, but
it's not here so I will explain. The Drag Link is the SB090520SR that was
asked for some time ago to strenghten the gear on the 2500. When I did the
3500 upgrades I milled the face of this part by the thickness of the FUS-703
steel plate and put it back into the same door sill "wrap" rivet holes, so
not hard to do guys and gals. The "inter-pitching" is simply adding another
rivet between each existing rivet in the forward door post closest to the
door (as I have done on Rebel's for 7 years) for LARGE tire operations and
also on both of the door post bulkheads immediately behind the door for
float operations. I would do them both no matter what configuration you plan
to fly! Without the extra rivets the skin apparently tries to buckle in the
inch or so gap between rivets.
Cheers,
Wayne G. O'Shea
www.irishfield.on.ca
***SAFETY BULLETIN***
MURPHY AIRCRAFT MFG. Ltd., DATE: 27 June 2002
8155 AITKEN ROAD,
CHILLIWACK,
B.C.
CANADA V2R 4H5
Tel: (604) 792-5855
Fax: (604) 792-7006
Murtech@murphyair.com
AIRCRAFT AFFECTED: SUPER REBEL 3500
Owners of SR3500's who are intending to fit the large "Alaska" wheels and
tires to their aircraft, should complete the following modifications.
Due to the greatly increased initial drag of the tires on touch down and the
extra weight of the rims, our demonstrator aircraft has shown slight
movement of the gear legs, and some inter-rivet buckling in the vertical
rivet line on the aft channel of the lift cage.
1/ The 2500 drag link should be installed as per bulletin 090520SR. This
will prevent any flexing of the steel plates FUS-703.
2/ Inter-pitching (installing an additional rivet between the existing
rivets) of the existing rivets with RV-1410's in the rivet lines indicated
in Fig. 1.
These modifications can be completed by all owners if desired.
Owners who intend going on floats should also complete inter-pitching of the
rivets in the two bulkheads indicated in Fig. 1.
-----------------------------------------------------------------