Sr3500 Upgarde - Leading Edge Doubler
Posted: Fri Feb 17, 2012 9:59 pm
Folks,
Does anyone have an idea as to why Murphy chose to leave the extra aluminum on the leading edge doubler for the 3500 lb upgrade? Mine is currently clecoe'd to the wing and drilled to the correct size as per the rivet map and it appears the next step is to just cut off the extra material prior to riveting. I have yet to figure out why the part wasn't cut to the correct dimensions in Chilliwack.
Any insight from those of you who have been there already would be most appreciated. I fear I have missed something.
Cheers, rj
R J Thomas
Lafayette, LA
rj.thomas@halliburton.com (rj.thomas@halliburton.com)
(337) 849-4136
Super Rebel N140SR (Under construction)
Does anyone have an idea as to why Murphy chose to leave the extra aluminum on the leading edge doubler for the 3500 lb upgrade? Mine is currently clecoe'd to the wing and drilled to the correct size as per the rivet map and it appears the next step is to just cut off the extra material prior to riveting. I have yet to figure out why the part wasn't cut to the correct dimensions in Chilliwack.
Any insight from those of you who have been there already would be most appreciated. I fear I have missed something.
Cheers, rj
R J Thomas
Lafayette, LA
rj.thomas@halliburton.com (rj.thomas@halliburton.com)
(337) 849-4136
Super Rebel N140SR (Under construction)