I am in the process of laying out the 9 hole pattern at the fuselage
bulkhead overlaps (3 columns with 3 rivets each). On a couple of the
bulkhead overlaps, the vertical rivet line on both outside columns comes
very close to the factory tooling holes.
Is it best practice to locate these holes inboard of the tooling holes
(this would leave me with a non symmetrical pattern), or is it
acceptable to leave these areas undrilled and unriveted utilizing only 7
rivets attaching the overlaps (2 on each outside column and 3 in the
middle) instead of the suggested 9?
Thanks for the information.
Terry Dazey
Rebel 662
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------
I am in the process of laying out the 9 hole pattern at the fuselage
bulkhead overlaps (3 columns with 3 rivets each). On a couple of the
bulkhead overlaps, the vertical rivet line on both outside columns comes
very close to the factory tooling holes.
Is it best practice to locate these holes inboard of the tooling holes
(this would leave me with a non symmetrical pattern), or is it
acceptable to leave these areas undrilled and unriveted utilizing only 7
rivets attaching the overlaps (2 on each outside column and 3 in the
middle) instead of the suggested 9?
Thanks for the information.
Terry Dazey
Rebel 662
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------