elevator spades
Posted: Mon Feb 20, 2012 6:33 am
Nigel,
Same as standard balance method. The lead triangular pieces reinstalled and elevator to level (neutral) when on the hinges with a small guesstimate for paint allowance. Add / subtract weight at the lead pieces to achieve desired balance.
Ralph
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------
Same as standard balance method. The lead triangular pieces reinstalled and elevator to level (neutral) when on the hinges with a small guesstimate for paint allowance. Add / subtract weight at the lead pieces to achieve desired balance.
Ralph
-----------------------------------------------------------------
List archives located at: https://mail.dcsol.com/login
username "rebel" password "builder"
Unsubscribe: rebel-builders-unsubscribe@dcsol.com
List administrator: mike.davis@dcsol.com
-----------------------------------------------------------------